Showing posts with label scope. Show all posts
Showing posts with label scope. Show all posts
Saturday, April 07, 2007
Scope
The Project Scope Document is the core of the project schedule. No project schedule can be maintained without a detailed scope document. Every ambiguous, unclear or fuzzy requirement in the scope document must, inevitably, turn into a missed deadline, a cost overrun or a dropped requirement.
Subscribe to:
Comments (Atom)
